Tomago 2 Borefield Station Civil Refurbishment

Building

About the Project

Tallai was contracted by Hunter Water to demolish the existing vacuum building, protect the existing life electrical boards and other plant and equipment within the building, and construct a new building over the existing building footprint. The project was valued at $350K.

The details scope of works included:

  • Demolition and Asbestos Removal
  • Excavation
  • FRP
  • Structural Steel
  • Recommission of electrical works
  • Metal Roofing and Cladding
  • Epoxy of existing dry well
  • Block work

 

Tomago 2 Borefield