Parramatta Light Rail Stage 1 – SC204 Driver Facilities

Building

About the Project

The CPB and Downer Joint Venture has engaged Tallai to construct driver facilities and amenities at multiple locations on the Parramatta Light Rail. The Project Value is $1.5M

The Work Scope generally involves:

  • performing all necessary civil and building works including excavation, installation of service, FRP,
  • blockwork, steelwork, roofing, guttering, external cladding
  • floor & wall covering, painting, internal fit out, lighting
  • temporary works, including design
  • supply and install all structural, building services
  • inground services
  • architectural components and finishes
  • internal fit out and amenity fit out
  • façade cladding
  • roofing, roof access