A civil refurbishment of the Tomago Pump Station, keeping a continuous water supply running to Grahamstown Water Treatment Plant.
Hunter Water engaged Tallai to deliver the design and construct upgrade of the Tomago Pump Station, a vital part of the region’s water infrastructure. Tallai demolished the existing vacuum building, protected the live electrical boards and other plant and equipment inside it, and built a new building over the existing footprint.
The upgrade was a key investment in safeguarding the Tomago Borefields’ operational integrity, supporting a resilient water supply as the community grows. The scope included civil refurbishment works, LV upgrades and equipment relocations, all executed with no unplanned disruptions to ongoing operations.
The project was about more than upgrading infrastructure. By preserving and protecting the original elements of the borefield pump station, a connection to the area’s past was kept. Tallai gifted the gantry crane to a local community group.
We deliver pump station upgrades and civil refurbishment inside live water networks across New South Wales and Queensland.
Talk to our team